1. Repair Dock (Doubled-Sided Pier off 235m Length).
2. Outfitting Dock (Doubled-Sided Pier off 215m Length).
3. Marginal Dock (Two Marginal Dock, 70m and 200m long respectively).
4. Dry-Dock 5 (269m x 36m; over blocks draft: 5.18m).
5. Dry-Dock 2 (157m x 19.5m; over blocks draft: 4.87m).
6. Machining and Mechanical Shop.
7. Pipe Mill and Assembly Shop (Pipe roller line with capacity of 9000 M.T./year).